L-outcome paras: first draft showed fees with no check date → added "(checked 16 Sep 2026)" to each line.
Table rows A-C: fee cells relied on the header label only → added (sample) inside every figure cell.
Workbook E2:E4: yearly-cost draft pointed at the header row → rewrote each cell to its own-row fee (E2=50000*B2 etc).
Workbook row 5: draft total summed through the total row → narrowed ranges to data rows only (D2:D4, E2:E4).
Sources: one candidate link was never opened → dropped it; only opened pages are listed.
Oxaide • UEN 201806463W • Research, not advice • REF SAMPLE-competitor
