Oxaide Data • BCA CR10B • snapshot 2026-09-17
Precast Concrete Production contractors (CR10B)
50 registered firms across 5 grades. 3 renewals due within 180 days.
How many BCA CR10B contractors are there?
50 registered firms at the 2026-09-17 snapshot.
How many CR10B registrations expire soon?
3 renewals due within 180 days. Check expiry before signing.
Firms by grade
| L1 | 14 |
| L5 | 14 |
| L6 | 12 |
| L4 | 7 |
| L2 | 3 |
Top-graded firms
| CHARTWORTH ENTERPRISE SINGAPORE PTE. LTD. • L1 | 01/07/2026 |
| KIM SENG HENG ENGINEERING CONSTRUCTION (PTE) LTD • L1 | 01/10/2026 |
| TEAMBUILD ENGINEERING & CONSTRUCTION PTE. LTD. • L1 | 01/07/2026 |
| YENG TONG CONSTRUCTION PTE LTD • L1 | 01/07/2026 |
| KUAN AIK HONG CONSTRUCTION PTE LTD • L2 | 01/07/2028 |
| HPC BUILDERS PTE. LTD. • L5 | 01/05/2028 |
| KWAN YONG CONSTRUCTION PTE LTD • L5 | 01/01/2027 |
| CHIP ENG SENG CONTRACTORS (1988) PTE LTD • L6 | 01/07/2026 |
Hiring a CR10B contractor?
Grades state capacity, not character. A pre-deal check reads officers, filings, and adverse signals before you pay a deposit. S$390, about 2 hours.
Source: data.gov.sg BCA registered contractors (Singapore Open Data Licence). Research, not advice. All Oxaide data →
Cite this page: Oxaide Data, “BCA CR10B contractors”, oxaide.com/data/contractors/cr10b.