Oxaide

Oxaide Data • BCA ME07 • snapshot 2026-09-17

High & Low Tension Overhead Line Installation contractors (ME07)

18 registered firms across 3 grades. 4 renewals due within 180 days.

How many BCA ME07 contractors are there?

18 registered firms at the 2026-09-17 snapshot.

How many ME07 registrations expire soon?

4 renewals due within 180 days. Check expiry before signing.

Firms by grade

L111
L34
L23

Top-graded firms

ENGIE SERVICES SINGAPORE PTE. LTD. • L101/07/2026
GIB AUTOMATION PTE LTD • L101/11/2026
INDECO ENGINEERS (PTE) LTD • L101/07/2026
SING MOH ELECTRICAL ENGINEERING PTE LTD • L101/07/2026
PROPELL INTEGRATED PTE LTD • L201/07/2027

Hiring a ME07 contractor?

Grades state capacity, not character. A pre-deal check reads officers, filings, and adverse signals before you pay a deposit. S$390, about 2 hours.

Source: data.gov.sg BCA registered contractors (Singapore Open Data Licence). Research, not advice. All Oxaide data →

Cite this page: Oxaide Data, “BCA ME07 contractors”, oxaide.com/data/contractors/me07.

© 2026 Oxaide (ox-AYD) • UEN 201806463W • Since 2018

Per-job • brief@oxaide.com • Support hi@oxaide.com

We wipe your uploads from our storage after 24h; your pack stays 90 days. Registry data via data.gov.sg under the Singapore Open Data Licence. Runs on leading AI infrastructure (privacy details). Human support via hi@oxaide.com, not a bot inbox.