Skip to main content
Oxaide Research

Oxaide Data • BCA RW03A • snapshot 2026-09-17

Escalator Installation Contractors contractors (RW03A)

70 registered firms across 1 grade. 11 renewals due within 180 days.

How many BCA RW03A contractors are there?

70 registered firms at the 2026-09-17 snapshot.

How many RW03A registrations expire soon?

11 renewals due within 180 days. Check expiry before signing.

Firms by grade

Single Grade70

Registered firms (5 of 70)

CONSTRUCTIONS INDUSTRIELLES DE LA MEDITERRANEE - CNIM SINGAPORE PRIVATE LIMITED • Single Grade01/07/2026
HITACHI ELEVATOR ASIA PTE. LTD. • Single Grade01/10/2028
KONE PTE LTD • Single Grade01/07/2028
OTIS ELEVATOR COMPANY (S) PTE LTD • Single Grade01/06/2026
SCHINDLER LIFTS (SINGAPORE) PTE LTD • Single Grade01/07/2026

Hiring a RW03A contractor?

Grades state capacity, not character. Read officers, filings, and adverse signals before you pay a deposit — the free UEN check, then the legitimacy guide.

Source: data.gov.sg BCA registered contractors (Singapore Open Data Licence). Research, not advice. All Oxaide data →

Cite this page: Oxaide Data, “BCA RW03A contractors”, oxaide.com/data/contractors/rw03a.