Oxaide Data • BCA RW03B • snapshot 2026-09-17
Escalator Maintenance Contractors contractors (RW03B)
71 registered firms across 1 grade. 9 renewals due within 180 days.
How many BCA RW03B contractors are there?
71 registered firms at the 2026-09-17 snapshot.
How many RW03B registrations expire soon?
9 renewals due within 180 days. Check expiry before signing.
Firms by grade
| Single Grade | 71 |
Registered firms (5 of 71)
| CONSTRUCTIONS INDUSTRIELLES DE LA MEDITERRANEE - CNIM SINGAPORE PRIVATE LIMITED • Single Grade | 01/07/2026 |
| HITACHI ELEVATOR ASIA PTE. LTD. • Single Grade | 01/10/2028 |
| KONE PTE LTD • Single Grade | 01/07/2028 |
| OTIS ELEVATOR COMPANY (S) PTE LTD • Single Grade | 01/06/2026 |
| SCHINDLER LIFTS (SINGAPORE) PTE LTD • Single Grade | 01/07/2026 |
Hiring a RW03B contractor?
Grades state capacity, not character. A pre-deal check reads officers, filings, and adverse signals before you pay a deposit. S$390, about 2 hours.
Source: data.gov.sg BCA registered contractors (Singapore Open Data Licence). Research, not advice. All Oxaide data →
Cite this page: Oxaide Data, “BCA RW03B contractors”, oxaide.com/data/contractors/rw03b.