Oxaide Data • BCA RW04A • snapshot 2026-09-17
MCPS Installation Contractors contractors (RW04A)
22 registered firms across 1 grade. 3 renewals due within 180 days.
How many BCA RW04A contractors are there?
22 registered firms at the 2026-09-17 snapshot.
How many RW04A registrations expire soon?
3 renewals due within 180 days. Check expiry before signing.
Firms by grade
| Single Grade | 22 |
Registered firms (10 of 22)
| ABJ ENGINEERING SERVCES LLP • Single Grade | 01/06/2028 |
| ASTEC TECHNOLOGY PTE. LTD. • Single Grade | 01/07/2027 |
| BESTLINK ELEVATOR PTE LTD • Single Grade | 01/06/2026 |
| BNF ENGINEERING (S) PTE LTD • Single Grade | 01/07/2027 |
| C&W SERVICES OPERATIONS PTE. LTD. • Single Grade | 01/07/2026 |
| CHRIS-RAY ENGINEERING PTE. LTD. • Single Grade | 01/10/2028 |
| CT ELEVATOR PTE. LTD. • Single Grade | 01/12/2027 |
| E M SERVICES PRIVATE LIMITED • Single Grade | 01/10/2028 |
| GLORY GRACE MECHANISED SERVICES PTE. LTD. • Single Grade | 01/05/2026 |
| GLORY GRACE PTE LTD • Single Grade | 01/07/2026 |
Hiring a RW04A contractor?
Grades state capacity, not character. A pre-deal check reads officers, filings, and adverse signals before you pay a deposit. S$390, about 2 hours.
Source: data.gov.sg BCA registered contractors (Singapore Open Data Licence). Research, not advice. All Oxaide data →
Cite this page: Oxaide Data, “BCA RW04A contractors”, oxaide.com/data/contractors/rw04a.