See the Forensic Engine Live
Send us your SCADA logs. Get a physics-informed forensic report identifying 5-15% yield gaps.
One-Time Forensic Diagnostic Audit
Verified Knowledge Base
Industrial Resilience Report
Resilience Verified // Physics-Informed
Generated: 2/17/2026
Scope & Objective
Verification of zero-trust architecture and air-gapped data persistence logic against IM8 Section 4.12 and IEC 62443 compliance frameworks.
1. Resilience Findings
We confirm that the **Zero-Trust Command Plane** is isolated from public ingress. All telemetry is ingested via unidirectional diodes, ensuring that even a compromised sovereign node cannot initiate a reverse shell to the core kernel.
Compliance Signal
ISO 27001 // PASS
Safety Signal
NIST 800-53 // PASS
Ready to diagnose your assets?
Send us your SCADA logs or plant CSVs. Get a physics-informed forensic report in 5 business days.
Singapore-Headquartered · Principal-Led Deployments
BESS · Solar PV · Grid Operations · Data Centers · Critical Infrastructure